Bants Lane was identified for an upgrade as part of West Northamptonshire’s Kier traffic signal improvement program. The project aimed to modernize the traffic signal system at the junction of Bants Lane and Chiltern Avenue, improving safety and traffic flow. The scope included reusing existing infrastructure where possible, installing new equipment, and minimizing disruption to the community.

Key project components involved jetting existing ducts, desilting access chambers, repositioning traffic signals, and installing new controller boxes, traffic equipment, ducting, and access chambers. The project was set to be completed within a four-week timeframe.

Three traffic management workers in high-visibility yellow jackets and white helmets standing in a road construction zone, facing away from the camera.

THE DELIVERY

A close-up of a sign or label with the words 'not responsible for lost or stolen items' printed on it.

The project commenced on July 22nd, following a two-week mobilization period that included preparation and approval of Risk Assessment and Method Statements (RAMS). Excavation points were safely prepared using detailed utility information, ensuring safe digging practices.

To maintain public safety, the junction of Bants Lane and Chiltern Avenue was closed, with a diversion route and two-way traffic lights set up in accordance with Chapter 8 traffic management regulations. S&D employed innovative techniques, such as vacuum excavation and the NAL MULTIduct™ system, to enhance efficiency and minimize disruptions:

Vacuum Excavation: This method allows precise control when maintaining or repairing buried assets, using remote or manual arms to safely remove soil once utilities are marked.

  • Cost efficiency.

  • Reduced reinstatement costs.

  • Prevention of utility strikes.

  • Minimal traffic disruption.

  • Reduced manpower and equipment needs.

Lightweight Duct System: MULTIduct™️: A lightweight, preformed ducting system that increases installation speed and durability.

MULTIduct™️ is a preformed ducting system ideal for installations in carriageway crossings, bridges, and tunnels. Made from nitrogen-foamed high-density polyethylene, it features:

  • High crush resistance and load strength.

  • Compatibility with surface mounting and restricted depth applications.

  • Available in 2, 4, 6, and 9-way formations, MULTIduct™️ is equipped with accessories for easy connection to traditional ducting. It has been tested for road applications at varying depths and maximum load conditions.

The Bants Lane traffic signal upgrade was successfully completed within the planned four-week timeframe and adhered to the project’s budget. By utilizing vacuum excavation and the MULTIduct™ system, the project minimized traffic disruptions and reduced the risk of utility damage, leading to a more efficient installation process.

The upgraded traffic signals improved the functionality and safety of the junction, delivering long-term benefits for the community while exemplifying innovative construction practices in public infrastructure projects.

THE RESULT

A blue rectangular banner or strip across the top of the image.

CATEGORIES

LATEST PROJECTS

Group of construction workers wearing orange safety vests and white helmets standing near street construction site, some workers have dirt on their pants.
A light yellow or beige camping tent set up outdoors on a grassy area, with trees in the background.

20TH JULY 2024

SIGNALS UPGRADE / TM

BANTS LANE - NORTHAMPTON

Workers in high-visibility clothing repair a road, with a large truck and blue barriers present.
A person holding a smartphone in front of a mirror, taking a selfie in a room with beige walls and a white door.

12TH JUNE 2024

SURFACING

HAWTHORNE ROAD - BIRMINGHAM

Construction workers in orange safety vests and helmets working on a street with a small excavator and bricks, surrounded by safety barriers.
A person sitting at a laptop in a cozy, well-lit room with a cat nearby.

10TH JUNE 2024

CIVILS

ABINGTON STREET - NORTHAMPTON

White Ford utility vehicle with S&D Traffic Management Ltd logo on the hood and side, parked on a street with trees in the background.
A close-up of a yellow sunflower with a dark center, set against a blurred background.

17TH JUNE 2023

ISO NHSS (NATIONAL HIGHWAYS SECTOR SCHEMES)

POPULAR PAGES