THE BRIEF

A blank cream-colored rectangular sign on a black background.

Hawthorne Road was identified as part of a broader program to address Category 2 safety defects over a 10-month period. Initially, a Confirm Report was issued on November 3, 2023, detailing the need for planning and resurfacing 389m² of Hawthorne Road. However, during the site visit with Kier and our team, the client was dissatisfied with the scope and requested a reassessment by the Network Stewards. This led to a revised report, increasing the work area to 745m². Further lobbying by a local councilor prompted another site visit, resulting in an additional increase to 1381m², requiring a 100mm depth treatment. The final scope included AC20 DBM and SMA10 PMB 60psv, with the final quotation submitted on March 24, 2024.

Two construction workers with high-visibility safety jackets and orange pants walking down a tree-lined street where roadwork is being done. Construction vehicles and equipment, including a small excavator, are visible in the background. Blue barriers line the sidewalk.

THE DELIVERY

A computer keyboard with a beige highlighting bar at the top.

The project was approved at the end of May, and we proceeded with detailed planning and preparation. Risk Assessment Method Statements (RAMS) were produced and approved, adhering to the client’s Health & Safety Policy. On June 6, 2024, the client's traffic management contractor implemented a full road closure and pedestrian barriers. A Ground Penetrating Radar (GPR) survey was conducted to ensure the treatment depth met client specifications. Over two days, we completed the cold milling, applied hot PMB Bond Coat, and installed a 60mm layer of AC20 DBM 40/60p, followed by a 40mm layer of SMA10 PMB 60psv. All work was tested and validated according to industry standards.

The resurfacing of Hawthorne Road was completed successfully, with all required road markings installed. The road was reopened, and the quality of work was met with satisfaction from both the client and local residents, who expressed their appreciation for the professionalism and efficiency of our workforce.

THE RESULT

Blue horizontal banner or bar

CATEGORIES

LATEST PROJECTS

A group of construction workers in orange and yellow safety gear, including helmets and high-visibility jackets, standing on a sidewalk at a construction site.
Empty light yellow background with subtle vertical lines.

20TH JULY 2024

SIGNALS UPGRADE / TM

BANTS LANE - NORTHAMPTON

Workers wearing high-visibility clothing and safety gear repairing a damaged road with a large truck and construction equipment.
A person gripping a lazily curled tail of a cat in a colorful setting.

12TH JUNE 2024

SURFACING

HAWTHORNE ROAD - BIRMINGHAM

Construction workers in orange uniforms and white helmets working on a sidewalk repair project with a yellow excavator and bricks, surrounded by orange and white safety barriers in an urban street.
A person dressed in black and wearing a white face mask, sitting in a car.

10TH JUNE 2024

CIVILS

ABINGTON STREET - NORTHAMPTON

A white Ford utility truck parked on a street, with a company logo and text on its side, surrounded by green trees.
A pale yellow vertical fabric roll or paper roll, slightly unrolled at the bottom.

17TH JUNE 2023

ISO NHSS (NATIONAL HIGHWAYS SECTOR SCHEMES)